Per-state totals (DataCenterMap + Aterio compilation): operating, under-construction, and planned facility counts, plus reported planned/operating power capacity and disclosed floor space. % of national is each state's share of all tracked facilities (est., from total counts). Click a column header to sort.
Click any state row to open its detail view (curated + community-mapped facilities, metrics, share of national, projections, tax incentives).
| State | Total | % of National | Operating | Under Constr. | Planned | Power Capacity | Total Space (sq ft) | Notes |
|---|
Detailed sites carry each project's power, investment, footprint and jobs, plus estimated local impact on water, electricity and household/ratepayer cost (water & homes-equivalent figures are estimates from the compilation's own size-class benchmarks, not facility-measured; investment & jobs are as stated). Mapped sites are crowd-sourced from OpenStreetMap (name/operator/town/state/power/coords) — coverage and quality vary.
Showing the full combined U.S. set. Type to search across both datasets (community-mapped pages auto-load on search); use the state dropdown to narrow, or switch to Detailed only for the rich curated cards.
| Set | Name / City | Operator | State | Power | Status / Method | Detail |
|---|
Every community-mapped (OpenStreetMap) data-center site with usable coordinates, plotted on a simple equirectangular projection of the contiguous U.S. (CONUS). Hover a point for details; click it to pin its info on the right. Use the state filter to isolate one state. Points are coloured by reported power class where a power figure is tagged. The curated “Detailed” compilation carries no coordinates, so it is not plotted here — see the Facilities tab for those rich cards.
A standalone, Indiana-only deep view of the state's data-center build-out — the detailed curated sites (New Carlisle/AWS, Fort Wayne/Google, Lebanon/Meta and others), the full community-mapped (OpenStreetMap) Indiana set, per-site local impact estimates, and any Indiana-specific 2030 outlook rows. Curated impact figures labeled (est.) are derived from size-class benchmarks, not facility-measured.
| Name | Operator | Town | Power | Method | OSM |
|---|---|---|---|---|---|
| Loading community-mapped Indiana sites… | |||||
How data centers reject heat — and how much water that costs. Methods range from open-loop evaporative towers (millions of gallons/day) to sealed closed-loop and immersion systems (near-zero ongoing draw). Every figure links its source. Where a widely-circulated claim could not be verified, it is not stated as fact.
| Facility | Cooling type | Water use | Location | Source |
|---|
Relationships computed from the data already on this page — nothing here is invented. Each chart pairs two real variables and adds a plain-language takeaway. Pairings without sufficient data are omitted.
Hyperscalers, colocation providers, bitcoin miners, energy-campus developers, and private-credit investors named in the compilation.
| Company | Type | Commitment | States | Notes |
|---|
CapEx, power, water, cost-to-ratepayer, funding, jobs, and public-opinion figures from the compilation.
Regional transmission operators most affected by data-center load growth.
| Operator | States Served | Impact |
|---|
Sales/use-tax abatements, exemptions, and credits states offer to attract data centers — plus reported revenue impact where known.
| State | Break Type | Amount / Duration | Requirements | Impact |
|---|
Cost, environmental, government-policy, public-opinion, and community-opposition issues surrounding the build-out.
| Case | Location | Parties | Status | Detail |
|---|
| Location | Project | Status | Detail |
|---|
Live headlines on the U.S. data-center build-out — power, grid, water, tax fights, lawsuits and new projects — aggregated from public news feeds and refreshed server-side daily. Click any headline to read the original source.
Documented, sourced forecasts for U.S. data-center electricity demand, grid strain, investment, water use and jobs through 2030. Every figure is attributed to a named forecaster (DOE, EPRI, IEA, Goldman Sachs, McKinsey, Deloitte and others); nothing here is our own projection. Multi-year series are drawn as inline trajectories.
The full directory of the upstream sources the data on this page comes from — not the API endpoints, the actual trackers, datasets, government reports, forecasters, peer-reviewed and industry publications, news publishers and community maps behind every figure. Grouped by what they feed, with the full clickable URL for each.
The distinct source URLs cited against specific figures across the dataset (count = number of figures each backs).
What this is: a read-only dashboard over a research compilation of the U.S. data-center build-out, served live from the TCG data service. Where multiple sources disagree (e.g. total facility counts range 3,000–4,500+), the per-source figures are preserved rather than reconciled.
What's included: per-state facility counts & power capacity, individual facilities with local-impact estimates, companies & commitments, grid-operator strain, state tax incentives, controversies & litigation, a live daily news feed, and a sourced 2030 outlook of documented third-party forecasts.
The full upstream-source directory is on the Sources tab.
Not independently verified. This is an informational aggregation, not investment, legal, or policy advice. Counts and dollar figures should be checked against primary sources before reliance.